{"id":133,"date":"2011-06-10T10:09:42","date_gmt":"2011-06-10T10:09:42","guid":{"rendered":"http:\/\/www.intrepid-engineering.co.uk\/?p=133"},"modified":"2012-08-23T21:09:13","modified_gmt":"2012-08-23T21:09:13","slug":"new-library-for-the-school-of-st-helen-st-katharine-abingdon","status":"publish","type":"post","link":"https:\/\/www.intrepid-engineering.co.uk\/index.php\/2011\/06\/new-library-for-the-school-of-st-helen-st-katharine-abingdon\/","title":{"rendered":"New Library for the School of St Helen &#038; St. Katharine, Abingdon"},"content":{"rendered":"<p>This three-storey concrete framed building provides a new library and IT classrooms for this independent girl\u2019s school. The structure consists of a reinforced concrete frame that provides clear open spaces internally, with traditional architectural style that compliments the other school buildings.<\/p>\n<p>Structural Design by Philip Goodliffe whilst working for Young &amp; Webb Limited.<\/p>\n<h6 class=\"posttitle\">Architect: Peregrine Bryant<\/h6>\n<h6>Contractor: Benfield &amp; Loxley Limited<\/h6>\n","protected":false},"excerpt":{"rendered":"<p>This three-storey concrete framed building provides a new library and IT classrooms for this independent girl\u2019s school. The structure consists of a reinforced concrete frame that provides clear open spaces internally, with traditional architectural style that compliments the other school buildings. Structural Design by Philip Goodliffe whilst working for Young &amp; Webb Limited. Architect: Peregrine [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[12,13],"class_list":["post-133","post","type-post","status-publish","format-standard","hentry","category-portfolio","tag-library","tag-school-of-st-helen-st-katharine"],"_links":{"self":[{"href":"https:\/\/www.intrepid-engineering.co.uk\/index.php\/wp-json\/wp\/v2\/posts\/133","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.intrepid-engineering.co.uk\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.intrepid-engineering.co.uk\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.intrepid-engineering.co.uk\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.intrepid-engineering.co.uk\/index.php\/wp-json\/wp\/v2\/comments?post=133"}],"version-history":[{"count":5,"href":"https:\/\/www.intrepid-engineering.co.uk\/index.php\/wp-json\/wp\/v2\/posts\/133\/revisions"}],"predecessor-version":[{"id":270,"href":"https:\/\/www.intrepid-engineering.co.uk\/index.php\/wp-json\/wp\/v2\/posts\/133\/revisions\/270"}],"wp:attachment":[{"href":"https:\/\/www.intrepid-engineering.co.uk\/index.php\/wp-json\/wp\/v2\/media?parent=133"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.intrepid-engineering.co.uk\/index.php\/wp-json\/wp\/v2\/categories?post=133"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.intrepid-engineering.co.uk\/index.php\/wp-json\/wp\/v2\/tags?post=133"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}